Successful offshore installation for Iconic on an unmanned platform.
A well was planned to be temporary abandoned for approximately 5 years. As per regulatory requirements, a monitoring system is required for suspension for an extended time period.
The iDT was successfully installed below a multi-set plug to provide real-time monitoring directly to the control room onshore.