Another successful iDT installation to monitor below a Tubing hanger plug at Martin Linge.
The Real-time monitoring was successful and enabled Equinor to pull the tubing hanger plug without the need for WL pressure control equipment simplifying the operation and saving operational rig time for completing the well in a more cost efficient manner.